ZTR has supplied transformer for Dneproblenergo

“Zaporozhtranformator” PJSC (ZTR) has manufactured and delivered the transformer 63 MVA, 150 kV for S/S Zavodskaya” (Ukraine). Equipment is to be installed instead of the transformer manufactured by ZTR, which had been operated above 50 years.

General contractor is “Dneproblenergo” PJSC, included into energy company DTEK. “Dneproblenergo is the strategic partner of ZTR, - said Galina KARYAKA, Head of Sales office for ZTR PJSC Ukraine, Byelorussia and Moldova. – More than 90% of the company equipment contains of transformers manufactured by “Zaporozhtranformator”; therefore it is too important for us to maintain quality of supplied equipment, being the leader of this branch”.

At selection of the supplier, the main requirements of “Dneproblenergo” PJSC were the terms of the transformers production and delivery. Together with ZTR, Russian and Foreign manufacturers of transformer equipment took part in this tender. Owing to the long-term experience of collaboration between ZTR and “Dneproblenergo”, well-timed deliveries of high-quality and reliable equipment having the operating life much longer if compared with declared one, “ZTR” PJSC has gained the confident winning in this tender.

Due to high level of housekeeping at “ZTR” PJSC, synchronous and efficient works of all departments, the transformer for S/S Zavodskaya” has been manufactured, tested and dispatched within specified terms and following the required technical parameters.

04.07.2012

Subscribe to our newsletters